Sheridan Blvd (SH-95) Over UPRR Construction Notice

Posted 05/15/12

Updated 06/22/12

Sheridan Boulevard (SH-95) over Union Pacific Rail Road is scheduled for bridge replacement from 05/29/12 through 08/31/13 by the Colorado Department of Transportation (CDOT).  The work includes installation of a new traffic signal at W 60th Ave as well as pedestrian access across the bridge for improved safety and mobility.  Construction will reduce travel lanes to one lane in each direction during the daytime and require nightly road closures for demolition, girder installation, and bridge deck work.  Travelers are advised to use caution near the construction site and seek alternate routes to avoid delays.

**  One Lane of Sheridan (SH-95) will closed in each direction at W 60th Ave between 7:00 AM and 3:30 PM from Monday 06/25/12 to Friday 06/29/12. **

Additional project information and notifications are available on the CDOT websites posted under Related Links.